KEY DATA
| Bridge type | | Suspension bridge |
| Length | | 200 foot |
| Deck width | | 5 foot |
| Deck material | | Aluminum |
| Construction | | 2006 |
| Cost | | Approximately $250,000 |
| |
The bridge was fabricated out of galvanized steel using 1 1/8" diameter main cables.
The far side of the bridge was inaccessible, so an initial skyline was rigged to move drilling equipment and anchor rods.
An helicopter was used to install the two towers on the far side,
then the first bridge cable was pulled across on the skyline.
In order to complete construction on far side, workers constructed a cat walk over the river.
Following the installation of the first cable, the remaining cables were pulled across using the first cable.
The bridge took approximately 10 days to erect.
| |
|
|
|
|