YUKON SUSPENSION PEDESTRIAN BRIDGE, BC   Highway Bridges and Related Structures
     
 

KEY DATA

Bridge type   Suspension bridge
Length   200 foot
Deck width   5 foot
Deck material  Aluminum
Construction   2006
Cost   Approximately $250,000

   The bridge was fabricated out of galvanized steel using 1 1/8" diameter main cables. The far side of the bridge was inaccessible, so an initial skyline was rigged to move drilling equipment and anchor rods. An helicopter was used to install the two towers on the far side, then the first bridge cable was pulled across on the skyline. In order to complete construction on far side, workers constructed a cat walk over the river. Following the installation of the first cable, the remaining cables were pulled across using the first cable.
The bridge took approximately 10 days to erect.
  
 
 LIONS GATE BRIDGE 
 SECOND NARROWS BRIDGE 
 PUNTLEDGE BRIDGE 
 IRONS CREEK BRIDGE 
 STANLEY PARK BRIDGE 
 CORNING BRIDGE 
 YUKON BRIDGE 
 COAL RIVER BRIDGE 
 McKAY RIVER BRIDGE 
 HANSARD BRIDGE 
 KIKOMUN BRIDGE 
 STONECUTTERS BRIDGE 
 SALMON RIVER BRIDGE 
 CANADA LINE, VANCOUVER 
     
 
   PHOTO 1   PHOTO 2   PHOTO 3   PHOTO 4   PHOTO 5    INFO     PDF